Время приёма посетителей с 09:00 до 12:30 часов
Республиканское государственное предприятие на праве хозяйственного ведения «Государственная вневедомственная экспертиза проектов»    
Телефон
+7 (7172) 57-44-84
E-mail
gosexpertiza@gosexpertiza.kz

Republican seminar-meeting under the Kazakhstan maintenance in projects on constructions on results of work for 9 months of 2012

2012-10-08
Republican seminar-meeting under the Kazakhstan maintenance in projects on constructions  on results of work for 9 months of 2012
With a view of execution of the assignment of the Government of Republic of Kazakhstan in the city of Pavlodar under the Kazakhstan maintenance the republican seminar-meeting on October, 5-6th, 2012 took place in projects on constructions on results of work for 9 months 2012. Employees of branches RSE "Gosexpertiza", Deputy Akim of Pavlodar area Abdykalykov A.D. and representatives of leading manufacturers of building materials, products, designs and the equipment have taken part in work of a seminar on the Pavlodar area. With an opening address the Deputy general director of RSE “Gosexpertiza” Smankulov A.S which has acted has noted importance and the importance of actions directed on increase in a share of the Kazakhstan maintenance in projects on construction in Republic of Kazakhstan. Also it has reported on the reached results for the accounting period and has designated the current problems put before republican system of state expertise appraisal of projects. During a republican seminar performances have been heard and presentations of products such enterprises as are lead: JSC "Kazenergocable" LLP «Arinvest», LLP «Pavlodar Pipe Plant", LLP «Sigmetex», LLC "Plant MVI", LLP Company "Styrol", LLP "KazBitumServis" and etc. Participants of a republican seminar with a view of acquaintance with technologies and the equipment at the operating enterprises and objects have visited: JSC "Kazenergocable" LLP "Pavlodar Pipe Plant" and LLP «Sigmetex». As a whole for 9 months of 2012 on republic RSE “Gosexpertiza” 7 312 units of the design documentation on construction, (reconstruction and repair) objects of industrial and construction engineering purpose in which are provided use of widely widespread domestic building materials, products, designs and the equipment have been considered. The lead analysis of the Kazakhstan maintenance in the civil-engineering designs considered by State examination has shown, that the share as a result of accepted measures for production domestic construction industry for 9 months of current year has made 78 % from resource cost.