The list of documentation for examination

Rules of representation the design-budget documentation for passage of state expertise of projects
1 Letter the customer (requisites)
2 Decision (order) of akimat about designing №________ from «____» ___________
The act of choosing of a site №______ from «____» ____________
The scheme of tap of a site №______ from «_____» __________
According to the order №30 from 6/8/2009 all initial materials should to be represented in the original, or under the discretion of the customer (investor) or the general designer can be presented in the copies certified by an inscription and a press of the customer (investor), or testified notarially.
3 Architecturally-planning assignment (АPA)
4 Outline sketch coordinated with the main architect of city
5 Design assignment
6 Specifications on:
- water supply and sanitation
- heating
- electricity
- telephones
- gas supply
- radiofication
- the storm sewers
7 Conclusion of ecological examination
8 Materials of engineering-geological researches
9 General explanatory note
10 General plan (the coordination with the main architect of city) Record of the chief engineer of the project
11 Architecturally-building decisions. Record of the chief engineer of the project
12 Plumbing and sanitation. Record of the chief engineer of the project
13 Heating, ventilation. Record of the chief engineer of the project
14 Technological decisions. Record of the chief engineer of the project
15 Electrotechnical part. Record of the chief engineer of the project
16 Communication and the signal system. Record of the chief engineer of the project
17 Gas supply. Record of the chief engineer of the project
18 External engineering networks. Record of the chief engineer of the project
19 Estimates documentation.
20 License of the design organization.
21 Calculation on the design and exploration work (PIR).
22 Order on the chief engineer of the project
The contract on carrying out of state expertise is made when due hereunder.